Temora Solar Farm
Temora
JLE Electrical Construction
Renewables
2025
JLE Electrical successfully delivered the augmentation, relocation, and installation of overhead powerlines for the newly developed 5 MW Temora Solar Farm in New South Wales. Our scope encompassed the Level 3 electrical design, including the management of stakeholder collaboration to secure all necessary approvals for construction. The project required extensive electrical infrastructure works to support the solar farm's power supply. Our team ensured the reliable transmission of electricity through the installation of high-quality overhead lines, advanced switchgear, and reclosers.
Given a tight timeline to deliver this project JLE carried out the L3 electrical design for the project along with the construction of the work. The project involved working in rural areas with limited access, but our team utilised specialised equipment and techniques to navigate the site efficiently and safely. With multiple stakeholders involved in the development of the solar farm, JLE Electrical maintained clear communication and collaboration with the project team to ensure that timelines and quality standards were met and the commissioning date for the farm was on time.